Smartlink

Assembly chamber SMARTLINK is intended for heavy weights’ lifting, lowering and handling using rail track that is suspended on the assembly chamber’s arches. This set of devices is supplied from the detached hydraulic power pack allocated at a distance from the manipulation zone.

No. of assembly teams2
Distance between lifting units2.35-3.5 [m]
Type of supplyHydr. Power Pack
Hydr. Oil tank’s capacity500 [l]
Driving trolley pulling force25 [kN]
Driving speed0,2 [m/s]
Single lifting unit’s lifting capacity40 [kN]
Speed of lifting3,5 [m/min]
Standard lifting height5 [m]